going nowhere slow

My goal this week was to get the trim installed in the bathroom, but everytime I thought I could begin, I would realize I needed to get 1 more little thing done before I could even begin. First I had to repair a small section of the floor I laid, and wait 1 day for the glue to dry. Then I was going to start and I realized I wasn't going to be able to do any of the trim without the furnace room access door installed. So I had to wait a day to buy it, and then another since you have to stain it first as well.
Then I was stuck at the door hanging part, as the door doesn't fit in it's original size, so I've been doing a lot of cutting and trimming, just to get the door to fit right.

Class starts next week, I have high hopes that this will be the last homework filled class I have to take. Then it's just 2 classes of thesis, and I should be done. Hopefully....

Post a comment